首页> 外文期刊>The Chemical Engineer >Ten more years for Dungeness
【24h】

Ten more years for Dungeness

机译:Dungeness再过十年

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

EDF ENERGY will extend operations at its Dungeness B nuclear plant by ten years to 2028 and has signed a series of contracts with suppliers to service its wider UK fleet. The extension of the operational life of the two advanced gas-cooled reactors at the 1,050 MW plant in Kent is made possible by a £150m (US$226m) investment programme, which has already seen a £75m upgrade to the control room computer systems and £8m for enhanced flood defences.
机译:EDF ENERGY将把其Dungeness B核电站的运营期限延长十年,至2028年,并已与供应商签署了一系列合同,为其更广泛的英国船队提供服务。一项1.5亿英镑(2.26亿美元)的投资计划可以延长肯特1,050 MW电厂的两个先进气冷堆的使用寿命,该计划已经对控制室计算机系统进行了7500万英镑的升级。 £ 8m用于增强防洪能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号