首页> 外文期刊>Crop management >Crop Management Challenges Increase With Early Corn Planting : Pioneer provides tips for managing early-season stress
【24h】

Crop Management Challenges Increase With Early Corn Planting : Pioneer provides tips for managing early-season stress

机译:早期玉米种植对作物管理的挑战越来越大:先锋提供了管理早期季节压力的技巧

获取原文
获取原文并翻译 | 示例
           

摘要

Des Moines, Iowa (February 25, 2008)--The trend toward planting corn earlier continues to grow. The reasons include increasing farm size and the need to cover a large number of acres within a shorter window of time at the beginning of the season and avoiding potential late-season drought and pest problems at the end. According to scientists with Pioneer Hi-Bred, a DuPont business, this trend presents growers with several crop management challenges that can impact crop productivity significantly.
机译:爱荷华州得梅因(2008年2月25日)-早些时候种植玉米的趋势持续增长。原因包括农场规模扩大以及在季节开始时需要在较短的时间内覆盖大量英亩土地,并避免在后期避免潜在的后期干旱和虫害问题。杜邦公司先锋Pioneer Hi-Bred的科学家认为,这种趋势给种植者带来了一些作物管理方面的挑战,这些挑战可能会严重影响作物的生产力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号