首页> 外文期刊>U.S. Coal Review >Xinergy gets South Fork project up and running, sending test shipments of its met coal
【24h】

Xinergy gets South Fork project up and running, sending test shipments of its met coal

机译:Xinergy启动并运行了South Fork项目,并发送了其已运煤的测试货

获取原文
获取原文并翻译 | 示例
           

摘要

Xinergy's South Fork project needed a little upgrading to jump start the coal marketing process. Now that the necessary work - which included construction of a preparation plant and loadout - has been completed, the pursuit of business for the metallurgical coal is apparently off to a rousing start. Xinergy President Bernie Mason is aglow with optimisim when discussing the development of the project and the potential he believes the mine holds for the future.
机译:Xinergy的South Fork项目需要进行一些升级,以启动煤炭销售过程。现在已经完成了必要的工作,包括建设选矿厂和进行装卸工作,显然,对冶金煤业务的追求已经开始。新能源总裁伯尼·梅森(Bernie Mason)在讨论该项目的发展以及他认为该矿场对未来的潜力时表示乐观。

著录项

  • 来源
    《U.S. Coal Review》 |2013年第1973期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号