首页> 外文期刊>Platt's Oilgram News >Dakota Access faces tight timeline to meet year-end start
【24h】

Dakota Access faces tight timeline to meet year-end start

机译:Dakota Access面临紧迫的时间表以迎接年终开始

获取原文
获取原文并翻译 | 示例
       

摘要

Washington-A lawyer for the $3.7 billion Dakota Access crude pipeline told a federal judge Wednesday that any injunction against the project to address a North Dakota tribe’s complaints could cause the company to miss its year-end startup target. “It’s really urgent for us to get a decision here,” Bill Leone said, adding that even a weeklong injunction “poses a critical threat to this project.” The 30-inch-diameter pipeline is designed to carry 470,000 b/d of crude from the Bakken and Three Forks production areas through South Dakota and Iowa, ending at existing pipeline networks in Patoka, Illinois.
机译:华盛顿-耗资37亿美元的达科他通道(Dakota Access)原油管道的律师周三告诉一位联邦法官,针对该项目的任何禁制令都将解决北达科他州部落的投诉,这可能导致该公司错过其年底启动目标。比尔·利昂说:“对于我们来说,在这里做出决定真的很紧急,”甚至是长达一周的禁令“对该项目构成了严重威胁。”该直径30英寸的管道设计为每天从巴肯和三个福克斯生产区通过南达科他州和爱荷华州运送470,000桶原油,终止于伊利诺伊州帕托卡的现有管道网络。

著录项

  • 来源
    《Platt's Oilgram News》 |2016年第167期|共1页
  • 作者

    Meghan Gordon;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:27:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号