首页> 外文期刊>Platt's Oilgram News >Eni restarts Goliat field after gas leak hampers ramp up
【24h】

Eni restarts Goliat field after gas leak hampers ramp up

机译:天然气泄漏阻碍加剧后,埃尼重新启动了Goliat油田

获取原文
获取原文并翻译 | 示例
       

摘要

London-Italy’s Eni has restarted oil production from its Goliat oil field in the Barents Sea off the coast of Norway after a gas leak forced a precautionary shutdown while ramping up output. Eni, which began output from the longawaited and much-delayed Arctic field on March 12, discovered a minor gas leak on April 17 during the final commissioning of the gas injection system, a company spokesman said. “Production of oil has been resumed and gas is being re-injected into the reservoir,” the spokesman said in emailed statement.
机译:意大利伦敦的埃尼(Eni)公司已从其位于挪威沿海巴伦支海(Barents Sea)的戈利亚特(Goliat)油田的石油生产重新开始,此前发生的天然气泄漏迫使该公司在提高产量的同时进行了预防性关闭。公司发言人说,埃尼公司于3月12日开始从人们期待已久的北极油田开始输出石油,该公司在注气系统最终调试期间的4月17日发现了轻微的天然气泄漏。发言人在电子邮件声明中说:“石油已经恢复生产,天然气正在被重新注入到储层中。”

著录项

  • 来源
    《Platt's Oilgram News》 |2016年第80期|共1页
  • 作者

    Robert Perkins;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:26:58

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号