首页> 外文期刊>Platt's Oilgram News >Suncor starts Line 9 filling for Montreal refinery
【24h】

Suncor starts Line 9 filling for Montreal refinery

机译:森科尔开始为蒙特利尔炼油厂提供9号线加油

获取原文
获取原文并翻译 | 示例
       

摘要

Calgary—Suncor Energy has started filling crude on Line 9 in Eastern Canada for its Montreal refinery, but will not rush plans to install a much-expected coker in that facility to process various grades of heavy crude, CEO Steve Williams said Thursday. Enbridge-operated Line 9 entails the reversal of a 397-mile pipeline between North Westover, Ontario, and Montreal, Quebec, and a capacity expansion to 300,000 b/d from 240,000 b/d for the entire Line 9 from Sarnia, Ontario, to Montreal.
机译:卡尔加里—Suncor Energy首席执行官史蒂夫·威廉姆斯(Steve Williams)周四表示,Suncor Energy已开始在加拿大东部的9号线为其蒙特利尔炼油厂填充原油,但不会急于在该设施中安装一个期待已久的焦化器以处理各种等级的重质原油的计划。由Enbridge运营的9号线需要颠倒安大略省North Westover和魁北克蒙特利尔之间397英里的管道,并将整个9号线从安大略省Sarnia的产能从240,000 b / d扩至300,000 b / d。蒙特利尔。

著录项

  • 来源
    《Platt's Oilgram News》 |2015年第214期|共1页
  • 作者

    Ashok Dutta;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:26:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号