...
首页> 外文期刊>Platt's Oilgram News >Iran sets deadline on Azadegan contract
【24h】

Iran sets deadline on Azadegan contract

机译:伊朗为Azadegan合同设定最后期限

获取原文
获取原文并翻译 | 示例

摘要

Tehran—China’s CNPC has less than two months to speed up work on a key upstream oil project or lose the contract, after the clock on a 90-day deadline began ticking more than a month ago, Iranian oil minister Bijan Zanganeh said at the weekend. Iranian officials have complained regularly about CNPC, which is developing both North and South Azadegan, and another Chinese company, Sinopec, which is in charge of Yadaveran. Both onshore fields straddle the border with Iraq and are among several “shared fields,” the development of which Zanganeh has made a top priority.
机译:德黑兰—伊朗石油部长比扬·赞加内(Bijan Zanganeh)周末表示,在90天最后期限开始计时后的一个多月前,中国石油天然气集团公司有不到两个月的时间来加快上游关键石油项目的工作或失去合同。 。伊朗官员经常抱怨中国石油天然气集团公司(CNPC)正在开发南阿扎德甘(Azadegan),另外还有一家中国公司中石化(Sinopec)负责雅达维兰。两个陆上油田都跨越了与伊拉克的边界,并且属于几个“共享油田”,赞加内的发展已成为其首要任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号