首页> 外文期刊>Platt's Oilgram News >Norway players face project delays on ‘overheating’
【24h】

Norway players face project delays on ‘overheating’

机译:挪威玩家面临“过热”的项目延误

获取原文
获取原文并翻译 | 示例
           

摘要

London—Norwegian offshore operators are likely to face fresh project delays and cost overruns in 2013 as high activity levels continue to pressure a service sector already at peak capacity, energy analysts Wood Mackenzie said. Following a recent ramp-up in exploration and development activity on the Norwegian Continental Shelf, the country’s oil industry shows signs of “overheating” resulting in rig shortages and creeping costs, Wood Mac said in its annual review of the Norwegian upstream sector published January 10.
机译:伦敦—能源分析师伍德·麦肯齐(Wood Mackenzie)表示,由于高活动水平继续给已经处于高峰产能的服务业施加压力,挪威离岸运营商在2013年可能面临新的项目延期和成本超支。 Wood Mac在1月10日发布的挪威上游行业年度评估报告中说,在挪威大陆架上的勘探和开发活动最近有所增加之后,该国的石油工业显示出“过热”的迹象,导致钻机短缺和成本攀升。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号