首页> 外文期刊>Platt's Oilgram News >TNK-BP’s JV in Brazil slips behind schedule
【24h】

TNK-BP’s JV in Brazil slips behind schedule

机译:TNK-BP在巴西的合资企业进度落后于计划

获取原文
获取原文并翻译 | 示例
           

摘要

Moscow—Anglo-Russian TNK-BP and Brazilian partner HRT are behind schedule on their joint project in Brazil’s Solimoes Basin due to challenging logistics and insufficient infrastructure, TNK-BP senior vice president for exploration, Christopher Einchcomb, said September 27. “When we entered the project, there was a plan put forward that we could drill potentially 20 exploration wells a year. Within a year we have drilled nine wells...so we are behind the schedule,” Einchcomb told reporters at a TNK-BP media briefing.
机译:莫斯科— TNK-BP勘探高级副总裁Christopher Einchcomb于9月27日表示,由于物流方面的挑战和基础设施不足,英俄TNK-BP和巴西合作伙伴HRT在巴西Solimoes盆地的联合项目进度落后。进入该项目后,提出了一项计划,即我们每年可能钻探20口勘探井。一年之内,我们已经钻了9口井...因此我们落后于进度。” Einchcomb在TNK-BP媒体简报会上对记者说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号