首页> 外文期刊>Platt's Oilgram News >UK's Petrofac starts second phase of Turkmen project
【24h】

UK's Petrofac starts second phase of Turkmen project

机译:英国的Petrofac开始土库曼项目的第二阶段

获取原文
获取原文并翻译 | 示例
       

摘要

Dubai-UK-based Petrofac said December 2 it has completed the first phase of a service contract for the giant South Yoloten gas field in Turkmenistan and has started work on the $3.4 billion second phase. Under the terms of the second-phase agreement, expected to require about two- and-a-half years, Petrofac will provide engi- neering, procurement and commissioning work on a lump-sum basis for a 10 billion cubic meter/year gas processing plant, as well as infrastructure and pipelines for the entire 20 Bcm/year South Yoloten field development.
机译:总部位于迪拜的英国Petrofac公司12月2日表示,已经完成了土库曼斯坦巨大的南约洛滕气田的服务合同的第一阶段,并已着手进行价值34亿美元的第二阶段的工作。根据预计需要大约两年半的第二阶段协议的条款,Petrofac将一次性提供工程,采购和调试工作,以处理每年100亿立方米的天然气整个20 Bcm /年的南约洛滕油田开发所需的工厂,基础设施和管道。

著录项

  • 来源
    《Platt's Oilgram News》 |2010年第252期|共1页
  • 作者

    Geoff King;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:22:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号