首页> 外文期刊>Platt's Oilgram News >BP spill heightens scrutiny of Enbridge pipeline outage
【24h】

BP spill heightens scrutiny of Enbridge pipeline outage

机译:BP漏油事件加剧了对Enbridge管道中断的审查

获取原文
获取原文并翻译 | 示例
       

摘要

Houston-Enbridge anticipates delays with its repairs to Line 6B, as a result of the swampy conditions surrounding the damaged segment, but shippers said August 4 the line may be receiving heightened regulatory oversight after the Macondo spill. Shippers who attended an August 3 Enbridge meeting in Calgary said increased regulatory scrutiny, in light of the swampy conditions and a possible general change in regulatory sentiment following the BP Macondo spill in the Gulf of Mexico, is the main reason the pipeline repairs are taking longer than expected. The 190,000 b/d Line 6B was shut July 26 following a spill in Michigan.
机译:Houston-Enbridge预计,由于受损部分周围的沼泽条件,其6B号线的维修工作将有所延误,但托运人表示,8月4日,在Macondo漏油事故后,该线可能会受到加强的监管。参加了8月3日在卡尔加里举行的恩布里奇会议的托运人说,鉴于沼泽条件以及在墨西哥湾BP Macondo溢油事故后监管情绪可能发生普遍变化,监管审查越来越严格,这是管道维修时间延长的主要原因超出预期。在密歇根州发生泄漏事故后,7月26日关闭了190,000桶/天的6B线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号