首页> 外文期刊>Platt's Oilgram News >UK’s Melrose expects first Romanian gas at end-2012
【24h】

UK’s Melrose expects first Romanian gas at end-2012

机译:英国的梅尔罗斯(Melrose)预计到2012年底将有第一批罗马尼亚天然气

获取原文
获取原文并翻译 | 示例
       

摘要

London-UK-based Melrose Resources expects the first natural gas from the Ana and Doina fields offshore Romania at the end of 2012, the company said August 17. Melrose is set to assume operatorship of the fields from Canada’s Sterling Resources once the UK company’s farm-in to the Midia and Pelican blocks is completed, it said. In December 2008, Melrose agreed to take a 32.5% stake in the Midia and Pelican concessions for $12 million, but the deal has still to be finalized. Midia contains the undeveloped Ana and Doina gas fields, which Melrose estimates to contain gross combined probable reserves of 345 Bcf of gas.
机译:该公司在8月17日表示,总部位于英国伦敦的Melrose Resources预计将于2012年底从罗马尼亚海上的Ana和Doina气田开采出第一批天然气。一旦英国公司的农场建成,Melrose将承担加拿大Sterling Sterling资源气田的运营权它说到米迪亚和鹈鹕街区已经完成。 2008年12月,梅尔罗斯(Melrose)同意以1200万美元的价格收购Midia和Pelican特许经营权的32.5%股权,但该交易仍有待最终确定。 Midia拥有尚未开发的Ana和Doina气田,Melrose估计这些气田的天然气总储量可能为345 Bcf。

著录项

  • 来源
    《Platt's Oilgram News》 |2010年第161期|共1页
  • 作者

    Stuart Elliott;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:22:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号