首页> 外文期刊>Platt's Oilgram News >Enbridge Line 6A at lower pressure after restart
【24h】

Enbridge Line 6A at lower pressure after restart

机译:重新启动后,Enbridge Line 6A在较低压力下

获取原文
获取原文并翻译 | 示例
           

摘要

Houston-Enbridge is running its 670,000 b/d Line 6A crude oil pipeline at reduced pressure after restarting the line October 10, a company spokesman said October 11. The pipeline was shut for repairs early October 8 because Enbridge found a defect in the 34-inch diameter pipeline during a planned integrity inspection. The repaired section of pipeline is in Wisconsin.
机译:公司发言人10月11日说,休斯敦-恩布里奇公司10月10日重启该管线后,其670,000桶/日的6A线原油管道在减压下运行。该管道由于10月8日初因在34-在计划的完整性检查过程中,管道直径为1英寸。管道的修复部分在威斯康星州。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号