首页> 外文期刊>Platt's Oilgram News >Israel's Tamar gas field faces new cost hike
【24h】

Israel's Tamar gas field faces new cost hike

机译:以色列的添马舰气田面临新的成本上涨

获取原文
获取原文并翻译 | 示例
       

摘要

Jerusalem-The total development cost of the Tamar natural gas field offshore Israel is expected to rise to at least $3.5 billion due to the need for additional infrastructure for the project, industry sources said November 2. A second gas pipeline and a second gas receiving terminal are needed based on esti- mates that the Tamar field will produce too much gas for one pipeline, which is planned to carry gas from Tamar to the existing Yam Thetis field and from there to the existing ter- minal at Ashdod, the sources said.
机译:耶路撒冷—业内消息人士在11月2日说,由于该项目需要额外的基础设施,以色列近海添马舰天然气田的总开发成本预计将至少增加至35亿美元。消息人士称,需要根据塔玛气田将为一条管道生产过多的天然气来进行估算,该管道计划将天然气从塔玛尔输送到现有的Yam Thetis油田,再从那里输送到阿什杜德的现有终端。

著录项

  • 来源
    《Platt's Oilgram News》 |2010年第216期|共1页
  • 作者

    Neal Sandler;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:22:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号