首页> 外文期刊>Platt's Oilgram News >Shell scraps 400,000 b/d upgrader plan on economics
【24h】

Shell scraps 400,000 b/d upgrader plan on economics

机译:壳牌放弃了40万桶/日的经济升级计划

获取原文
获取原文并翻译 | 示例
           

摘要

Vancouver-Shell Canada has canceled plans for a second oil sands upgrader that could have cost about C$30 billion ($29 billion), opting instead to squeeze more capacity out of its existing and already-approved facilities. John Abbott, executive vice president for heavy oil at the Canadian unit of Royal Dutch Shell, told a news conference October 8 the company has withdrawn a regulatory application for the 400,000 b/d upgrader at its Scotford refining complex near Edmonton, Alberta.
机译:加拿大温哥华-壳牌公司(Vancouver-Shell Canada)取消了第二台油砂升级器的计划,该升级程序可能耗资约300亿加元(合290亿美元),而是选择从现有和已经批准的设施中挤出更多产能。荷兰皇家壳牌加拿大公司重油执行副总裁约翰·阿伯特(John Abbott)在10月8日的新闻发布会上说,该公司已撤回了位于艾伯塔省埃德蒙顿附近的苏格兰福德精炼厂的40万桶/日提质塔的监管申请。

著录项

  • 来源
    《Platt's Oilgram News》 |2010年第200期|共1页
  • 作者

    Gary Park;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号