首页> 外文期刊>Platt's Oilgram News >Final Macondo kill delayed to September
【24h】

Final Macondo kill delayed to September

机译:Macondo的最终杀戮推迟至9月

获取原文
获取原文并翻译 | 示例
       

摘要

Houston-A final killing of BP’s blown-out Macondo exploration well is not expected now until early September, after an August 19 decision to replace the well’s malfunctioning blowout preventer prior to interception by a relief well that has been drilling since May 1. Describing the decision as stemming from an “overabundance of caution,” US National Incident Commander Thad Allen directed BP to begin the procedures required to switch the existing BOP in 4,993 feet of water with a replacement waiting on board Transocean’s Development Driller II drillship at the site in the Gulf of Mexico about 40 miles from Venice, Louisiana.
机译:休斯敦-直到9月初才有望最终杀死BP喷出的Macondo勘探井,此前,该决定是在8月19日决定用自5月1日以来一直在钻的一口救援井进行拦截之前更换该井的防喷器。由于“过分谨慎”的决定,美国国家突发事件指挥官Thad Allen指示BP开始将所需的BOP切换至4,993英尺水深所需的程序,并在Transocean的Development Driller II钻井船上等待替换物。墨西哥湾距路易斯安那州威尼斯约40英里。

著录项

  • 来源
    《Platt's Oilgram News》 |2010年第163期|共2页
  • 作者

    Gary Taylor;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:22:14

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号