首页> 外文期刊>Platt's Oilgram News >Cairn: On track for Q3 output start at key Indian fields
【24h】

Cairn: On track for Q3 output start at key Indian fields

机译:凯恩(Cairn):第三季度产量有望在印度主要油田开始

获取原文
获取原文并翻译 | 示例
       

摘要

London—UK-based Cairn Energy March 31 reported a $367 million net profit for 2008, in line with expectations, and said it remains on track to start production from its key Indian oil fields during the third quarter.Despite recent reports in the Indian press, Cairn said the Mangala field in Rajasthan is expected to start producing from the first processing train with a capacity of 30,000 b/d in the third quarter, with pipeline commissioning before the end of the year.
机译:位于伦敦的英国凯恩能源公司(Cairn Energy)3月31日公布的2008年净利润为3.67亿美元,与预期相符,并表示仍有望在第三季度从其主要印度油田开始生产。凯恩说,拉贾斯坦邦的Mangala油田有望在第三季度从第一条加工能力为30,000 b / d的加工列车开始生产,并在年底之前进行管道调试。

著录项

  • 来源
    《Platt's Oilgram News》 |2009年第64期|共1页
  • 作者

    Robert Perkins;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:21:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号