首页> 外文期刊>Platt's Oilgram News >Drillers seek solutions for hole they’re in
【24h】

Drillers seek solutions for hole they’re in

机译:钻工寻求解决方案,以解决他们所处的漏洞

获取原文
获取原文并翻译 | 示例
       

摘要

Houston—Two fleet status reports released by drillers this week illustrate the economic problems that are squeezing an upstream industry that clearly intends to use every means available to wriggle out of contracts or extract the most mileage possible from existing deals. The potential that drilling rigs under construction will be delivered late is the nail on which oil companies could hang arguments to reject contracts signed months or even years ago when dayrates were reaching stratospheric heights, analysts said March 4.
机译:休斯顿-钻井公司本周发布的两份车队状态报告说明了经济问题,这些问题正在挤压着上游行业,该行业显然打算使用所有可用手段来取消合同或从现有交易中获得最大的收益。分析师3月4日表示,正在建设中的钻机可能延迟交付的原因在于,石油公司可能会争论不休,以拒绝数月甚至数年前签订的合同,当时日价已达到平流层高。

著录项

  • 来源
    《Platt's Oilgram News》 |2009年第45期|共1页
  • 作者

    Starr Spencer;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:21:04

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号