Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

机译:美国超导体的高温超导体电缆和故障限流器项目的现状

获取原文
获取原文并翻译 | 示例
           

摘要

This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE, The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.
机译:本文将介绍美国超导公司目前正在进行的三个关键计划的状态。第一个计划是LIPA项目,它是一种传输电压高温超导电缆计划,在美国能源部的资助下。能够承载574 MVA的600 m电缆已于2008年4月22日在LIPA电网中成功安装并调试。将提供项目概述,系统级设计细节和运营数据。此外,还将描述新授予的LIPA II项目的状态。第二个计划是Hydra项目,在美国国土安全部的资助下,设计,开发和演示了具有故障电流限制功能的HTS电缆。该电缆长300 m,设计用于在13.8 kV的配电级电压下承载96 MVA。该电缆将于2010年在纽约曼哈顿永久安装并通电。将介绍Hydra项目的初始状态。将要讨论的最终程序是由美国能源部资助的输电电压,高温超导故障限流器。该项目包括115 kV FCL的设计,建造和测试,以在4-5年的时间内进行输电。计划为南加州爱迪生变电站进行安装和测试。将报告项目概述和第一阶段的进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号