...
首页> 外文期刊>CRU Monitor: Aluminium >Spotlight on smelter projects
【24h】

Spotlight on smelter projects

机译:聚焦冶炼厂项目

获取原文
获取原文并翻译 | 示例

摘要

In this spotlight, we focus on the 90 smelter projects that are listed in our forthcoming Long-Term Outlook for Aluminium 2010 edition as being either completed between 2005 and 2010, under construction, probable or possible. Projects under construction have a combined capacity of 8.644m tpy, with a further 7m tpy of projects deemed to be probable. Most projects under construction are located in China, which is not surprising given how quickly Chinese smelters have been to react, both to the economic downturn and to the pickup in demand.
机译:在这一关注点上,我们重点关注即将发布的《铝材长期展望2010》中列出的90个冶炼厂项目,这些项目已于2005年至2010年间完成,正在建设中,可能或可能在建。正在建设中的项目合计年产能为864.40万吨,另外还有700万吨的项目被视为可能。多数在建项目位于中国,鉴于中国冶炼厂对经济下滑和需求回升的反应速度之快,这不足为奇。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号