...
首页> 外文期刊>PetroChemical News >Qenos Now Commissioning Final Phase Of Two-Year Revamp Project in Altona
【24h】

Qenos Now Commissioning Final Phase Of Two-Year Revamp Project in Altona

机译:Qenos现在开始在阿尔托纳进行为期两年的改造项目的最后阶段

获取原文
获取原文并翻译 | 示例

摘要

Altona— Qenos has started commissioning the final phase of a two-year revamp and expansion project at its Altona complex in Melbourne, Australia (PCN, 24 June 2013, p 2). "Over the past two years there have been many thousands of hours involved in designing, constructing and testing for the final phase of our revamp expansion project," explained Andrew Lake, general manager of operations. "This equipment is now ready for commissioning at the olefins site," he added.
机译:阿尔托纳— Qenos已开始在澳大利亚墨尔本的阿尔托纳工厂进行为期两年的改建和扩建项目的最后阶段(PCN,2013年6月24日,第2页)。 “在过去的两年中,我们的改型扩建项目的最后阶段涉及到设计,建造和测试,涉及数千小时,”运营总经理安德鲁·莱克(Andrew Lake)解释说。他补充说:“该设备现已准备在烯烃现场调试。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号