...
首页> 外文期刊>Creamer Media's Mining Weekly >Winder system engineers involved in large platinum shaft project
【24h】

Winder system engineers involved in large platinum shaft project

机译:参与大型铂金轴项目的络筒机系统工程师

获取原文
获取原文并翻译 | 示例
           

摘要

Mine winder system engineering company DRA Technical Services (DRATS) is involved in platinum producer Impala Platinum's Shaft 17 project, which is one of the largest projects currently taking place in the platinum industry, says DRATS MD Graham du Plessis. The project involves the simultaneous sinking of three shafts - the production, ventilation and refrigeration shafts. Du Plessis says that the main shaft is currently being sunk to a depth slightly less than 2 000 m, a new venture for a platinum mine.
机译:矿山绕线机系统工程公司DRA技术服务公司(DRATS)参与了铂金生产商Impala Platinum的Shaft 17项目,这是铂金行业目前正在进行的最大项目之一,DRATS MD Graham du Plessis说。该项目涉及同时下沉三个竖井-生产竖井,通风竖井和制冷竖井。杜普莱西斯说,目前正在将主轴下沉至略小于2000 m的深度,这是一家铂金矿的新项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号