Overcoming Challenges--SRK overcomes challenges in tailings dam designs

机译:克服挑战-SRK克服了尾矿坝设计中的挑战

获取原文
获取原文并翻译 | 示例
           

摘要

SOUTH African-founded group of consulting engineers and scientists SRK Consulting is continuing its involvement in the design of ring-dyke tailings dams to accommodate a fairly large deposition rate. However, the company adds that the availability of sufficient land is becoming a problem and, thus, is increasing the final heights of such dams.
机译:南非成立的咨询工程师和科学家小组SRK Consulting正在继续参与环式尾矿坝的设计,以适应相当大的沉积速率。但是,该公司补充说,充足土地的可用性正成为一个问题,因此,正在增加此类水坝的最终高度。