Firm Timeline--Ncondezi Coal eyes 2017 start-up for Mozambique power project

机译:公司时间表-Ncondezi Coal计划在2017年启动莫桑比克电力项目

获取原文
获取原文并翻译 | 示例
           

摘要

Aim-listed Ncondezi Coal last week published the results of a definitive feasibility study (DFS) on a proposed 1 800 MW mine-mouth coal-fired power plant at the company's namesake project, in the Tete province of Mozambique.Ncondezi, which earlier confirmed the economic and technical viability of the project, said that it would develop the coal-fired plant in phases of 300 MW each, with targeted expansion to 1 800 MW by 2023, in conjunction with a yet-to-be-selected strategic partner.The initial 300 MW Phase 1A unit would be commissioned in 2017 and was estimated to cost $504-million, excluding a $50-million transmission capital expenditure (capex) connecting the unit to existing transmission to meet current domestic energy demand.
机译:在目标市场上市的Ncondezi Coal上周发布了一项最终可行性研究(DFS)的结果,该可行性研究的结果是在该公司同名项目中拟建的1800 MW矿井口燃煤电厂(位于莫桑比克)。该项目的经济和技术可行性表示,将与一个尚未选定的战略合作伙伴一起,分阶段开发300兆瓦的燃煤电厂,目标是到2023年将其扩展到1800兆瓦。最初的300兆瓦1A阶段机组将于2017年投入使用,估计成本为5.04亿美元,其中不包括将该机组连接至现有输电以满足当前国内能源需求的5,000万美元的输电资本支出(资本支出)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号