...
首页> 外文期刊>Creamer Media's Mining Weekly >Uranium plant commissioning to enter final stages
【24h】

Uranium plant commissioning to enter final stages

机译:铀厂投产进入最后阶段

获取原文
获取原文并翻译 | 示例
           

摘要

Emerging uranium-miner First Uranium is soon to enter the final stages of commissioning of its Ezulwini mine uranium plant and plans to commission the first two modules of the uranium plant at its Mine Waste Solutions (MWS) tailings recovery operation in the next quarter. The Ezulwini mine uranium plant is scheduled for ammonium diuranate (ADU), or yellowcake, recovery by April 2009. First Uranium vice-president for investor relations Bob Tait explains that, before this can take place, the operation of all circuits within the uranium plant must be successfully tested with ore and reagents, with the final stage being the successful precipitation of ADU.
机译:新兴的铀矿开采商First Uranium即将进入其Ezulwini矿山铀厂投产的最后阶段,并计划在下个季度的矿山废物解决方案(MWS)尾矿回收业务中投产铀厂的前两个模块。计划于2009年4月恢复Ezulwini矿铀厂的铀酸二铵(ADU)或黄饼。第一位铀矿主管投资者关系的副总裁Bob Tait解释说,在铀矿发生之前,铀厂中所有回路的运行必须用矿石和试剂成功测试,最后阶段是ADU的成功沉淀。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号