首页> 外文期刊>Natural gas intelligence >Diamondback Expecting to Beat '15 Production Guidance, Plans 2-3 Rig Program in Permian
【24h】

Diamondback Expecting to Beat '15 Production Guidance, Plans 2-3 Rig Program in Permian

机译:菱纹背响尾蛇有望超越'15生产指导,计划在二叠纪实施2-3钻机计划

获取原文
获取原文并翻译 | 示例
           

摘要

Permian Basin pure-play operator Diamondback Energy Inc. said it appears to have eclipsed its 2015 production guidance, thanks in part to strong production in the fourth quarter, and it now plans to spend $280-375 million for a two- or three-rig drilling program in 2016. Meanwhile, the Midland, TX-based company said it plans to raise about $226 million from selling four million shares of common stock, which initially would be used to pay down debt.
机译:二叠纪盆地纯油气运营商Diamondback Energy Inc.表示,由于第四季度的强劲产量,它似乎已经超出了其2015年的产量指导,并且它现在计划斥资280-375百万美元购买两座或三座钻机这家总部位于德克萨斯州米德兰的公司表示,计划通过出售400万股普通股筹集约2.26亿美元,这些普通股最初将用于偿还债务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号