首页> 外文期刊>Creamer Media's Mining Weekly >Erection of Sishen pilot plant is progressing well
【24h】

Erection of Sishen pilot plant is progressing well

机译:Sishen中试工厂的安装进展顺利

获取原文
获取原文并翻译 | 示例
           

摘要

Mining and minerals project house TWP, a subsidiary of the Basil Read group, reports that the erection of the Sishen expansion project (SEP) lB beneficiation pilot plant at iron-ore producer Kumba Iron Ore's Sishen mine, in the Northern Cape, is progressing well. Civil, mechanical and piping work are near completion and electrical and instrumentation installation is in progress.
机译:Basil Read集团的子公司矿业和矿产项目公司TWP报告说,位于北开普省的铁矿石生产商Kumba Iron Ore的Sishen矿山的Sishen扩展项目(SEP)lB选矿试验工厂的建设进展顺利。土木,机械和管道工程已接近完成,电气和仪表安装正在进行中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号