...
首页> 外文期刊>Mining Journal >Rio Tinto to invest 803 milion US dollars to ramp up Argyle underground
【24h】

Rio Tinto to invest 803 milion US dollars to ramp up Argyle underground

机译:力拓(Rio Tinto)将投资8.03亿美元,将阿盖尔(Argyle)地下项目扩建

获取原文
获取原文并翻译 | 示例
           

摘要

RIO Tinto is to invest 803 million US dollars into the underground block-cave project at its Argyle diamond mine in Western Australia. The project was "slowed in 2009 due to the global financial crisis", according to Harry Kenyon-Slaney, chief executive of the company's diamonds unit. The underground mine is expected to be fully operational in 2013, and will extend the life of Argyle to least 2019. Construction activity will ramp up in the first half of 2011, with targeted production rates of 9Mt/y within two years.
机译:力拓(RIO Tinto)将投资8.03亿美元,用于其位于西澳大利亚州阿盖尔钻石矿的地下探洞工程。该公司钻石部门首席执行官哈里·肯尼恩·斯兰尼(Harry Kenyon-Slaney)表示,该项目“由于全球金融危机而在2009年放缓”。该地下矿预计将于2013年全面投入运营,并将Argyle的使用寿命延长至至少2019年。建设活动将在2011年上半年加快,目标是在两年内实现9Mt / y的年生产率。

著录项

  • 来源
    《Mining Journal》 |2010年第17期|共1页
  • 作者

    GARETH TREDWAY;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号