首页> 外文期刊>Metal Bulletin >CUT AT CORUS PACKAGING HIGHLIGHTS PLIGHT OF EUROPEAN TIN PLATE PRODUCERS
【24h】

CUT AT CORUS PACKAGING HIGHLIGHTS PLIGHT OF EUROPEAN TIN PLATE PRODUCERS

机译:切勿在包装包装上凸显欧洲锡板生产商的困境

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Corus's decision last week that it would cut capacity at its Corns Packaging Plus (CPP) plant at Troste in Wales is a symptom of an industry increasingly under pressure from over-capacity, soaring raw materials costs and competition from aluminium, industry sources told MB. A Corus spokeswoman told MB the company plans to cut production by 120,000 tpy from January, blaming raw materials costs and rising capacity in Europe, and confirmed the company had paused production in the first quarter this year for similar reasons. "This business has been underperforming and the decision was taken to try and address the demand/supply balance in Europe as a whole," the spokeswoman told MB. "In addition to capacity, there has also been pressure from high raw material costs." ArcelorMittal is thought to be considering taking similar measures at its European works, while llva, which is owned by Italy's Riva Group, has extended its scheduled summer maintenance shutdown to last until the end of the third quarter, according to unconfirmed reports.
机译:业内人士告诉MB,Corus上周决定削减其在威尔士Troste的Corns Packaging Plus(CPP)工厂的产能的决定是一个行业日益承受产能过剩,原材料成本飞涨以及铝竞争的压力的征兆。 Corus的一位发言人告诉MB,该公司计划从1月份起将年产量削减12万吨,这归咎于原材料成本的增加和欧洲产能的增加,并确认该公司出于类似原因已于今年第一季度停产。发言人告诉MB:“这项业务表现不佳,因此决定尝试解决整个欧洲的需求/供应平衡问题。” “除了产能外,原材料成本高昂也带来了压力。”据未经证实的报告称,安赛乐米塔尔(ArcelorMittal)被认为正在考虑在其欧洲工厂采取类似措施,而意大利里瓦集团(Riva Group)旗下的llva公司已将其夏季维修计划的停机时间延长至第三季度末。

著录项

  • 来源
    《Metal Bulletin》 |2007年第9005期|共1页
  • 作者

    PHILLIP PRICE;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号