首页> 外文期刊>Metal Bulletin >NAS RESTARTS NEW MELTSHOP
【24h】

NAS RESTARTS NEW MELTSHOP

机译:NAS重新启动新的融通

获取原文
获取原文并翻译 | 示例
           

摘要

SUN CITY, SOUTH AFRICA - North American Stainless, the Acerinox subsidiary in Ghent, Kentucky, started up its 800,000 tpy meltshop for the second time on May 4. The plant's first melt took lace on February 2, but a transformer failure caused progress with the start-up to be delayed.NAS, on which Acerinox has spent 1.1 bn dollars since 1993, is Spain's largest investment in the USA. Victoriano Munoz Cava, Acerinox's chairman and ceo, expressed deep dissatisfaction with the equipment suppliers to the NAS meltshop project, citing delays in the deliver of equipment as well as the problems with the transformer in an interview while he was attending the 6th annual meeting and conference of the ISSF. SMS Demag was the lead contractor on the project but director of communications Thomas Isagew declined to comment when contacted by MB. ABB, which supplied the transformer, was unable to comment as MB went to press.
机译:南非太阳城-Acerinox肯塔基州根特市的子公司North American Stainless于5月4日第二次启动其年产80万吨的熔炼厂。该厂的第一次熔炼于2月2日开始进行,但变压器故障导致该工厂的进展。自1993年以来,Acerinox在NAS上花费了11亿美元,是西班牙在美国的最大投资。 Acerinox的主席兼首席执行官Victoriano Munoz Cava在NASA参加第六届年会和会议时接受采访时表示,对设备供应商的延迟以及变压器出现的问题,他们对NAS熔炼厂项目的设备供应商深表不满。 ISSF。 SMS Demag是该项目的主要承包商,但与MB联系时,传播总监Thomas Isagew拒绝置评。提供MB的ABB无法发表评论。

著录项

  • 来源
    《Metal Bulletin》 |2002年第8674期|共1页
  • 作者

    BOB JONES;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号