...
首页> 外文期刊>Fertilizer Week >Uralkali plans to produce from Solikamsk-2 in 2020
【24h】

Uralkali plans to produce from Solikamsk-2 in 2020

机译:Uralkali计划在2020年从Solikamsk-2生产

获取原文
获取原文并翻译 | 示例

摘要

Uralkali announced a new strategy for 2015-2020 in the wake of flooding at its 2.3 million mt/year Solikamsk-2 mine. The plan includes construction of a new mine at SK-2, the company said in a statement. Uralkali will build two new shafts at the SK-2 mine by 2020 to remove the remaining reserves in the mine, the majority of which are still intact, and return to yearly production of 2.3 million mt. Effectively this means production from SK-2, which flooded in November, is lost until that point.
机译:Uralkali宣布在其230万吨/年的Solikamsk-2矿山发生洪灾后宣布2015-2020年的新战略。该公司在一份声明中说,该计划包括在SK-2建造一座新矿。 Uralkali将在2020年之前在SK-2矿山上建造两个新竖井,以清除该矿山中的剩余储量,其中大部分仍完好无损,并恢复至230万吨的年产量。实际上,这意味着直到11月,SK-2的产量都已经损失了,而11月淹没了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号