...
首页> 外文期刊>Fertilizer Week >Phosphate rock production resumes in Tunisia
【24h】

Phosphate rock production resumes in Tunisia

机译:突尼斯恢复磷矿石生产

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Production of phosphate rock has now been resumed in Tunisia following several weeks of strikes affecting both production and the transport of phosphate rock and downstream products. Production of DAP at Gabes as well as TSP was resumed at the end of last week and production of phosphoric acid at the TIFERT unit will be restarted imminently. Whereas rock supply has been affected since mid December with the strike by the transport workers, downstream production has been affected since January 12 when rock production was suspended due to a second strike by the miners and rock supplies were finally exhausted. TIFERT loaded its last cargo for CIL/India on January 12.
机译:经过数周的罢工影响了磷矿石和下游产品的生产和运输,突尼斯现已恢复了磷矿石的生产。上周底,Gabes的DAP和TSP的生产恢复了,而TIFERT装置的磷酸生产将立即重启。自12月中旬以来,由于运输工人的罢工,岩石供应受到影响,而下游开采则自1月12日起受到影响,当时矿工因第二次罢工而暂停了岩石生产,最终耗尽了岩石供应。 TIFERT于1月12日向CIL /印度装载了最后一批货物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号