【24h】

UK Horse Hill potential

机译:英国马山潜力

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Horse Hill Developments reports that the final Horse Hill-1. (HH-1) Portland test near Gatwick Airport in England flowed at a stable dry oil rate of 323 b/d of oil-double the previously reported rate. "The final total aggregate stable dry oil flow rate from two Kimmeridge limestones plus the overlying Portland sandstone stands at 1,688 b/d. Over the 30-90 hour flow periods from each of the three zones, no clear indication of any reservoir pressure depletion was observed. Further analysis of data is ongoing and will be reported shortly," said partner UK Oil & Gas Investments (UKOG).
机译:Horse Hill Developments报告说,最终的Horse Hill-1。 (HH-1)英格兰盖特威克机场附近的波特兰试验的稳定干油率为323 b / d,是先前报道的两倍。 “来自两个金梅里奇石灰岩加上上覆的波特兰砂岩的最终总稳定干油总流量为1,688 b / d。在三个区域中每个区域的30-90小时流量期间,没有明确表明储层压力耗尽的迹象。合作伙伴英国石油与天然气投资公司(UKOG)表示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号