首页> 外文期刊>E&P daily >Greka’s West Bengal drilling
【24h】

Greka’s West Bengal drilling

机译:Greka的西孟加拉钻探

获取原文
获取原文并翻译 | 示例
           

摘要

Greka Drilling has started preparations to drill the third well for Essar Oil in the Raniganj Block, West Bengal, India under a contract with the country’s coalbed methane (CBM) producer signed in February. Greka Drilling has successfully drilled two direc- tional wells for Essar under the contract. The first well was spudded on 8 May, while the second well was completed by the same GD75 rig on 5 June, with a total of 2,439m (8,002ft) drilled over the course of 28 days.
机译:根据与该国2月签署的该国煤层气(CBM)生产商的合同,Greka Drilling已开始准备在印度西孟加拉邦Raniganj区块为Essar Oil钻探第三口井。根据合同,Greka Drilling已成功为Essar钻了两个定向井。第一口井于5月8日开钻,第二口井于6月5日由同一台GD75钻机完工,在28天的时间内总共钻了24.39亿(8,002英尺)。

著录项

  • 来源
    《E&P daily》 |2016年第9期|共1页
  • 作者

    Eamp; P daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号