首页> 外文期刊>E&P daily >UK Horse Hill potential
【24h】

UK Horse Hill potential

机译:英国马山潜力

获取原文
获取原文并翻译 | 示例
           

摘要

Horse Hill Developments reports that the final Horse Hill 1 (HH-1) Portland test near Gatwick Airport in England flowed at a stable dry oil rate of 323 b/d of oil – double the previously rate. “The final total aggregate stable dry oil flow rate from two Kimmeridge limestones plus the overly- ing Portland sandstone stands at 1,688 b/d. Over the 30-90 hour flow periods from each of the three zones, no clear indication of any reservoir pres- sure depletion was observed. Further analysis of data is ongoing and will be reported shortly,” said partner UK Oil & Gas Investments (UKOG).
机译:Horse Hill Developments报告称,英格兰盖特威克机场附近的最后一个Horse Hill 1(HH-1)波特兰试验以323 b / d的稳定干油速率流动,是先前速率的两倍。 “来自两个金梅里奇石灰岩加上上覆的波特兰砂岩的最终总稳定干油总流量为1,688桶/天。在三个区域中每个区域的30-90小时流量期间,没有清楚地看到任何储层压力枯竭的迹象。合作伙伴英国石油和天然气投资公司(UKOG)表示,目前正在进一步分析数据,并将在短期内报告。

著录项

  • 来源
    《E&P daily》 |2016年第21期|共1页
  • 作者

    Eamp; P daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号