首页> 外文期刊>E&P daily >Wintershall’s Brage faults
【24h】

Wintershall’s Brage faults

机译:温特歇尔的布拉奇断层

获取原文
获取原文并翻译 | 示例
           

摘要

Norway’s Petroleum Safety Authority (PSA) has carried out an audit of Wintershall’s electrical installations on the offshore Brage platform – and regulatory violations were detected. “The objective of the audit was to inspect how the company is complying with the regulations relating to working in and operating electrical installations. The audit gave special emphasis to how Wintershall works with electrical installations and those parts of the company’s management system that comprise the roles, responsibilities and duties of the personnel responsible for elec- trical plant during its design engineering, opera- tion, modification and maintenance,” the PSA said.
机译:挪威石油安全局(PSA)对离岸Brage平台上的Wintershall的电气装置进行了审核-发现违规行为。 “审计的目的是检查公司如何遵守有关在电气设备中工作和操作的规定。审核特别强调了Wintershall如何与电气装置以及公司管理系统的各个部分配合使用,这些部分包括负责电气设备设计,运营,改造和维护的人员的职责,责任和职责, PSA表示。

著录项

  • 来源
    《E&P daily》 |2016年第14期|共1页
  • 作者

    Eamp; P daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号