Commercial production has started from the Ophir Energy-operated Kerendan field, Indonesia. Production started at a rate of 85.0-141.6 Mcm/d (3-5 MMcf/d) to enable PLN, Indonesia's stateowned electricity distributor, to commission a power plant and transmission system.
展开▼