首页> 外文期刊>E&P daily >Bowleven tests Cameroon well
【24h】

Bowleven tests Cameroon well

机译:Bowleven很好地测试了喀麦隆

获取原文
获取原文并翻译 | 示例
       

摘要

Bowleven is undertaking an extended well test programme on the Moambe well in Cameroon. “To date, the Moambe well has achieved a maximum stabilised flow rate of 206.8 Mcm/d (7.3 MMcf/d) through a 48/64-inch choke with a flowing well head pressure of 664 psig with no signs of depletion during the initial test period,” Bowleven said. “As a result of this success, the well has now moved into the planned extended test period. This is intended to confirm sustainable deliverability to a proposed gas-to-power development scheme. Initial indications are that under such a development scenario the Moambe well would be capable of delivering around 113.3-141.6 Mcm/d (4-5 MMcf/d).
机译:Bowleven正在喀麦隆Moambe井上进行扩展的试井计划。 “迄今为止,Moambe井通过一个48/64英寸的节流阀达到了最大最大稳定流量206.8 Mcm / d(7.3 MMcf / d),流动井头压力为664 psig,在初始阶段没有损耗的迹象。测试期,” Bowleven说。 “由于取得了这一成功,该井现已进入计划的延长测试期。这旨在确认拟议的气电开发计划的可持续交付能力。初步迹象表明,在这样的开发方案下,Moambe井将能够提供约113.3-141.6 Mcm / d(4-5 MMcf / d)的流量。

著录项

  • 来源
    《E&P daily》 |2015年第25期|共1页
  • 作者

    Eamp; P daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号