Oilex reports that the Cambay-77H well in Cambay Production Sharing Contract (PSC) in the Cambay Basin, Gujurat, India has experience problems. Drilling of the 12.25-inch hole section reached 1,627m (5,336ft) measured depth, which is around 27m (87ft) above the planned casing point for the 9.625-inch casing.
展开▼