France's Technip has been awarded a Front-End Engineering and Design (FEED) contract by BP that covers the design of a Spar hull and mooring systems for the Mad Dog Phase 2 project in the US Gulf of Mexico (GoM). "This first award comes under the framework of the 10-year Spar platform master services agree- ment signed in 2011," said Technip. Mad Dog lies near Green Canyon Block 825. The Mad Dog Phase 2 Spar will be located near the first Mad Dog Spar delivered by Technip for BP in 2004, and installed on Green Canyon 782.
展开▼