首页> 外文期刊>E&P daily >J. Ray wins Saudi deal
【24h】

J. Ray wins Saudi deal

机译:J. Ray赢得沙特协议

获取原文
获取原文并翻译 | 示例
           

摘要

J. Ray McDermott has been awarded a project to upgrade crude gathering and power supply facilities in Saudi Aramco's Safaniya field in Saudi Arabia. The infrastructure upgrade and electrification project will help sustain crude oil production to meet Aramco's 'Maximum Sustainable Capacity' targets for the field by 2013. The work includes engineering, procurement, construction, and installation of a new tie-in platform (STP-20) with a 6,000 tonne topside, a new electrical deck module for an existing platform (STP-18), a 53km, 42-inch trunk line, four new infield lateral flowlines and valve skids, 156km of subsea electrical cable, and the modification and electrification of nine existing wellhead platforms. Engineering design work will start in the second quarter of this year, with contract completion expected during 2013.
机译:J. Ray McDermott获得了一项升级沙特阿美沙特阿拉伯Safaniya油田的原油收集和供电设施的项目。基础设施升级和电气化项目将有助于维持原油产量,以实现阿美公司到2013年该油田的“最大可持续能力”目标。工作包括工程,采购,建造和安装新的配套平台(STP-20)拥有6,000吨的顶部,一个用于现有平台(STP-18)的新电气甲板模块,一条53公里,42英寸的干线,四条新的内场侧向管线和阀门滑道,156公里的海底电缆以及改装和电气化现有的9个井口平台中。工程设计工作将于今年第二季度开始,预计合同将于2013年完成。

著录项

  • 来源
    《E&P daily》 |2010年第25期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号