首页> 外文期刊>E&P daily >Turkey test flows
【24h】

Turkey test flows

机译:土耳其测试流程

获取原文
获取原文并翻译 | 示例
           

摘要

Otto Energy and Incremental Petroleum have test flowed the Ikihoyuk-1 well in Western Turkey.Ikihoyuk-1 flowed dry gas at rates up to 3.8 MMcf/d(107.6 Mcm/d)of gas over the interval 1,456-1,486ft(444-453m)on a 38/64-inch inch choke"This rate is the highest so far seen from Otto's Edirne wells and is from only one of three similar zones in this well,'said Otto."Ikihoyuk-1 was the first well drilled as part of a campaign designed to prove up significant volumes of gas to enable a combination of these gas discoveries to be placed on production by mid-2009."
机译:奥托能源公司(Otto Energy)和增量石油公司(Incremental Petroleum)已对土耳其西部的Ikihoyuk-1井进行了测试.Ikihoyuk-1在1,456-1,486ft(444-453m)的间隔内以3.8 MMcf / d(107.6 Mcm / d)的速度输送干气”在38/64英寸英寸的节流阀上,“该速率是迄今为止从奥托(Otto)的爱迪尔内(Edirne)井看到的最高速率,并且仅来自该井三个类似区域中的一个,”奥托说。” Ikihoyuk-1是第一个钻探的井。旨在证明大量天然气的运动的一部分,以使这些天然气发现的组合能够在2009年中期投入生产。”

著录项

  • 来源
    《E&P daily》 |2008年第may27期|共1页
  • 作者

    E amp; P Daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号