首页> 外文期刊>International Oil Daily >BG Starts Exports From QCLNG Train 2
【24h】

BG Starts Exports From QCLNG Train 2

机译:BG从QCLNG火车2开始出口

获取原文
获取原文并翻译 | 示例
       

摘要

BG has loaded and shipped on schedule its first LNG cargo from the second production train at the company's Queensland Curtis LNG (QCLNG) facility in Australia. The 4.25 million ton/yr Train 2 facility loaded the cargo on board the Maran Gas Posidonia, BG announced on Monday. The vessel is bound for Chinese state CNOOC's Ningbo terminal and is due to arrive around Jul. 23, according to shipping data. The second train is expected to take six months to ramp up and the 8.5 million ton/yr QCLNG will see production plateau at around 8 million tons/yr around mid-2016, BG said.
机译:BG已按计划在澳大利亚昆士兰州柯蒂斯LNG(QCLNG)工厂的第二条生产列车上装载并装运了第一批LNG货物。 BG周一宣布,该年产能为425万吨的Train 2工厂将货物装载在Maran Gas Posidonia号上。根据运输数据,该船将开往中国国家海洋石油总公司的宁波码头,预计将于7月23日左右到达。 BG表示,第二列火车预计将需要六个月的时间才能建成,年产能为850万吨的QCLNG将在2016年中期之前达到约800万吨/年的生产平稳期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号