MORE ABOUT COST ESTIMATING PROCESS ANALYZER PROJECTS: Accuracy estimates should become tighter as the project progresses

机译:有关成本估算过程分析器项目的更多信息:随着项目的进行,准确性估算应该会更加严格

获取原文
获取原文并翻译 | 示例
           

摘要

In last month's issue, we made the case for accurate analyzer system project cost estimates, discussed the common causes and special factors that influence analyzer system estimates, and presented best practices to ensure accurate analyzer system estimates (Control, March '07, p. 59, or at www.controlglobal.com/articles/2007/054.html). We'll now address estimate accuracy and cost by project stage, sources of estimating information, types of costs by work breakdown structure (WBS), and types of construction contracts. We recall from the first article in this series (Control, June '06, p. 49, or at www.control-global.com/articles/2006/112.html) that we can break the analyzer project life cycle into five chronological stages (see Table 1). We shall confine our discussion in this article to Stages 1 through 3.
机译:在上个月的期刊中,我们为准确的分析仪系统项目成本估算提供了依据,讨论了影响分析仪系统估算的常见原因和特殊因素,并提出了确保准确的分析仪系统估算的最佳实践(Control,2007年3月,第59页) ,或访问www.controlglobal.com/articles/2007/054.html)。现在,我们将介绍按项目阶段估算的准确性和成本,估算信息的来源,按工作分解结构(WBS)划分的成本类型以及建筑合同的类型。我们从本系列的第一篇文章(《 Control》,06年6月,第49页,或访问www.control-global.com/articles/2006/112.html)中回想起,我们可以将分析仪项目生命周期按时间顺序分为五个阶段(请参见表1)。我们将在本文中的讨论限于第一阶段到第三阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号