...
首页> 外文期刊>International Oil Daily >Ithaca Energy: Greater Stella Development Progressing Well
【24h】

Ithaca Energy: Greater Stella Development Progressing Well

机译:伊萨卡能源:斯特拉更大的发展进展顺利

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Development of Canadian Ithaca Energy's Greater Stella Area in the UK North Sea is now progressing according to plan, the company said in its second-quarter results presentation Tuesday. Completion of the Ithaca-operated project was previously pushed back to the middle of next year from late this year because of delays in building the floating production facility (IOD May12'14). During the quarter, drilling of the third development well at Greater Stella was completed. The strong results of the flow test performed, along with the results of the first two wells, have de-risked the initial annualized production forecast from the project of approximately 16,000 barrels of oil equivalent per day net to Ithaca, the company said.
机译:该公司在周二的第二季度业绩报告中表示,加拿大伊萨卡能源公司在英国北海大斯特拉地区的开发目前正在按计划进行。由于建造浮动生产设施的延迟(IOD,2014年5月12日),伊萨卡岛(Ithaca)运营的项目之前已从今年年底推迟到明年年中。在该季度中,Greater Stella的第三口开发井的钻探完成了。该公司表示,所进行的流动测试的强劲结果以及前两口井的结果,已使该项目的初期年化产量预测(该项目每日净产油量约为16,000桶油当量)降低了伊萨卡岛的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号