首页> 外文期刊>International Oil Daily >Total Mulls Relief Wells to Stop Elgin Leak
【24h】

Total Mulls Relief Wells to Stop Elgin Leak

机译:总计埃尔斯井缓解埃尔金泄漏

获取原文
获取原文并翻译 | 示例
           

摘要

Total on Friday was mulling plans to drill two relief wells to intercept the gas leak from its North Sea Elgin platform while also looking at ways of extinguishing the flare left alight when workers fled the rig the previous Sunday, amid continued concern the escaping gas cloud could ignite and destroy the rig (IOD Mar.30'12). According to Total EP UK's managing director, Philippe Guys, gas has been leaking at a rate of about 200,000 cubic meters (7.1 million cubic feet) per day.
机译:道达尔(Total)周五正在考虑计划钻两个减压井,以拦截北海埃尔金平台(North Sea Elgin)平台的天然气泄漏,同时还研究了灭火方法,以消除工人在上周日逃离钻机时遗留下来的火炬,因为人们继续担心逸出的天然气云可能点燃并摧毁钻机(IOD,2012年3月30日)。据道达尔英国公司董事总经理菲利普·盖斯(Philippe Guys)称,每天的天然气泄漏量约为20万立方米(710万立方英尺)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号