首页> 外文期刊>International Oil Daily >BP Finds Gas for Third Tangguh LNG Train
【24h】

BP Finds Gas for Third Tangguh LNG Train

机译:BP为第三届Tangguh LNG火车找到天然气

获取原文
获取原文并翻译 | 示例
       

摘要

BP has discovered sufficient new gas reserves in its Tangguh field to give the go-ahead for a third LNG train at its Tangguh project, the head of Indonesian oil and gas watchdog BP Migas said on Friday. R. Priyono, the chairman of BP Migas, told reporters that the BP-led Tangguh consortium could start building the third train in 2015 and complete it in 2018 - assuming, observers say, that the UK major gives the go-ahead. "The result of reserve certification shows that BP can build a third LNG train with a capacity of 3.8 million tons per year," he said. The LNG would be sold into the domestic market to meet growing demand (IOD Jun.2'11).
机译:印尼石油和天然气监管机构BP Migas的负责人周五表示,BP已在其Tangguh气田发现了足够的新天然气储量,以便为其Tangguh项目的第三批LNG火车提供批准。 BP Migas董事长R. Priyono告诉记者,由BP牵头的Tangguh财团可能会在2015年开始建造第三列火车,并在2018年完成-观察家说,假设这名英国少校同意了。他说:“储备证书的结果表明,BP可以建造第三座LNG火车,年产能为380万吨。”液化天然气将出售到国内市场以满足不断增长的需求(IOD,2011年6月2日)。

著录项

  • 来源
    《International Oil Daily》 |2011年第154期|共1页
  • 作者

    Clara Tan;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 12:59:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号