Setting time: An important criterion to determine the length of the delay period before steam curing of concrete

机译:凝结时间:确定混凝土蒸汽养护前延迟时间长度的重要标准

获取原文
获取原文并翻译 | 示例
           

摘要

Some precast concrete plants expose freshly made concrete elements to steam curing immediately after casting. This is detrimental to properties of the product; therefore, some delay prior to the steam curing process is beneficial. This paper contains the results of an investigation on the effects of various delay intervals selected based on initial setting time of concrete. Four different delay periods and two different steam curing periods at 80 deg C (5 and 10 h) were used with two concrete types, namely C25 and C40. Compressive strength tests were performed at 1, 3, 7, 28, and 90 days. Setting time of the concrete was found to be an important criterion to determine the length of the delay periods.
机译:一些预制混凝土厂在浇筑后立即将刚制成的混凝土构件暴露于蒸汽养护下。这不利于产品的性能。因此,在蒸汽固化过程之前进行一些延迟是有益的。本文包含对根据混凝土初始凝固时间选择的各种延迟间隔的影响进行研究的结果。在80摄氏度(5和10小时)下使用了四个不同的延迟时间和两个不同的蒸汽固化时间,并使用了两种混凝土类型,即C25和C40。在1、3、7、28和90天进行抗压强度测试。发现混凝土的凝固时间是确定延迟时间长度的重要标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号