首页> 外文期刊>Arab Oil & Gas >Saudi Aramco Is Seeking a Reduction in the Rates Negotiated for Three Drilling Rigs Leased from Hercules Offshore
【24h】

Saudi Aramco Is Seeking a Reduction in the Rates Negotiated for Three Drilling Rigs Leased from Hercules Offshore

机译:沙特阿美正在寻求降低三架从大力神海上租赁的钻机的谈判价格

获取原文
获取原文并翻译 | 示例
       

摘要

In application of the cost reduction policy it announced at the beginning of this year, Saudi Aramco informed Hercules Offshore on 1 June that it was to reduce the daily rates payable under the five-year contracts concluded for the lease of the Hercules 261, Hercules 262 and Hercules 266 drilling rigs. The American company had disclosed in February that it had been notified by Saudi Aramco that it was terminating a drilling contract for the Hercules 261 rig with effect from 27 March. Hercules Offshore added that it was in talks with Saudi Aramco for a possible reduction in the day rates for the Hercules 262 and 266 rigs (AOG, 16 March, 2015).
机译:沙特阿美公司在今年年初宣布降低成本政策后,于6月1日通知赫拉克勒斯近海公司,将降低根据赫拉克勒斯261,赫拉克勒斯262签订的五年合同所要支付的每日租金和Hercules 266钻机。这家美国公司在2月份披露,沙特阿美公司已通知该公司,该公司将从3月27日起终止Hercules 261钻机的钻探合同。 Hercules Offshore补充说,正在与沙特阿美(Saudi Aramco)商讨是否可能降低Hercules 262和266钻机的日费(AOG,2015年3月16日)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号