首页> 外文期刊>Arab Oil & Gas >Siemens to Supply a Mobile 400-kV Substation for a Power Station that Hanwha Is Building for Sonelgaz
【24h】

Siemens to Supply a Mobile 400-kV Substation for a Power Station that Hanwha Is Building for Sonelgaz

机译:西门子将为韩华为Sonelgaz建造的电站提供移动式400 kV变电站

获取原文
获取原文并翻译 | 示例
           

摘要

The German company Siemens announced a “world first” on 26 May, referring to a mobile 400-kV substation it is going to supply for the dispatch of the electricity to be produced by a 560-MWpower station at Biskra that is being built in two phases by the South Korean company Hanwha Engineering and Construction Corporation. When on stream in 2015, the plant will be operated by the Societe de Production de l’Electricite, a subsidiary of the state power utility Sonelgaz. The mobile substation (pictured) will speed up the power station’s connection to the national grid.
机译:德国西门子公司于5月26日宣布了“世界第一”,这是指它将为Biskra的一个560 MW发电站生产的电力调度提供电力,该发电站将分两个部分建造由韩国韩华工程建设公司负责。该工厂将于2015年投产时,将由国家电力公司Sonelgaz的子公司Societe de Production de l'Electricite运营。移动变电站(如图所示)将加快电站与国家电网的连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号